If any contractor to whom such work has been let shall fail to perform the same according to the terms specified in his contract, action may be had in behalf of the board of drainage commissioners against such contractor and his bond in the superior court for damages sustained by the levee or drainage district, and recovery made against such contractor and his sureties. In such an event the work shall be advertised and relet in the same manner as the original letting. (1909, c. 442, s. 23; 1911, c. 67, s. 5; C.S., s. 5343.)