Skip to content

A public reference institution of the State of North Carolina's law

PUBLISHED

N.C.G.S. § 136-89.183C

Accelerated Yadkin River Veterans Memorial Bridge Replacement Project.

Effective date
2026-08-08
Last verified
2026-08-09
Source
official source
Revision history
view all versions
(a) Contract for Accelerated Construction of the Yadkin River Veterans Memorial Bridge Replacement Bridge Project. - The Authority shall study, plan, develop, undertake preliminary design work, and analyze and list all necessary permits, in preparation for construction of a replacement bridge and approaches for the Yadkin River Veterans Memorial Bridge over the Yadkin River and between Rowan and Davidson Counties, in order to provide accelerated, efficient, and cost-effective completion of the project. (b) Replacement Bridge; Termini. - The bridge constructed pursuant to this section shall be a replacement bridge, with north and south termini located in general proximity to the termini of the existing Yadkin River Veterans Memorial Bridge. (2007-299, s. 1; 2012-42, s. 3.)

Reviewed 2026-08-09 · source_verified